Maintenance
of rectifier.
Recently
loco no.16446 failed on 16/07/2014 due to failure of rectifier (a
diode had burnt).
In addition to
maintenance instructions and testing procedures of rectifiers issued earlier
vide Diesel/ Maint. /HQs & Shed/30, dated: 05-09-2011, Sheds are directed
to implement following measures immediately for improving reliability.
1. Cleaning:
In situ air blowing and gentle wiping of diode
should be done in every schedule. Inaccessible area should be cleaned by long
stemmed bottle brush in every schedule. Spray cleaning of diodes should be done
in M4 and above schedule by opening cover. After spray cleaning, diode should
be wiped dry.
2. Condition monitoring in trip
schedule:
a) Voltage spikes: Diodes are venerable to voltage
spikes and spikes if not arrested will cause long term damage to diodes.
Snubber capacitors and resistors should be visually checked for deformation due
to short circuit, overheating and loose terminals. Capacitance measurement of the
capacitors should be measured by capacitance meter. Capacitance value should
remain within ± 10% of original value. A healthy capacitor shall give a kick and show
very high resistance. A capacitor showing short circuit or low resistance (less
than 10 K ohm) should be rejected.
b) Temperature: Surface temperature of
individual diode should be measured and its trend monitoring should be done.
Temperature rise beyond 10% of last value is a cause of concern and warrants
detailed investigation in section.
c) Resistance: Forward and Reverse resistance
of diode should be measured by 1000V meggar. Forward resistance should be zero
and reverse resistance should be in Mega Ohms ( 200-500 MΩ).If any diode is
showing less reverse resistance , it should be changed. Care should be taken
before conducting Meggaring by isolating circuit wire no 34 and 36 from
rectifier out going terminal board to avoid damage to electronic components.
3. Heat sink: Heat sink should not be opened by shed. It has
been learnt that diodes are removed from heat sink during stripping. This
practice should be immediately stopped as diodes and heat sinks are factory
fitted by applying suitable heat conducting agent.
4. Creepage path: Creepage
path for current flow should not be permitted. It should be arrested by
ensuring regular cleaning and providing additional insulation layer in
vulnerable locations.
Sheds
are advised to implement the above instructions and to send feed back to HQ.