Overdue
major schedules.
Line failures in overdue
major schedule locos have been observed. Following actions are required to be
taken:
1.
Make list of items prone to failures in overdue locos like
small motors, air brake valves, rubber hoses etc. List to be based on actual
line and shed failures in last 3 years in overdue major schedule locos.
2.
Items featuring in above list to be replaced in running
schedules or in medium schedules as decided by shed.
3.
Root cause of failure of items in overdue major loco:
quality of material, fitment workmanship to be identified. Each to be tackled
by detailed action plan.
4.
Planning for overdue/due major schedule should be based upon
matrix of factors namely
a)
line failures, b) overdue period, c) condition of major
assemblies, d) load box
result, e) feed back of SSE/Running, drivers booking and loco history books-
non-scheduled repairs etc.
Priority
of loco to be taken for major schedule should be done on above basis to ensure
focussed need based alteration without compromising reliability.
5.
No overdue POH/RB loco should be allowed in service. Mail/Exp
locos to be sent to POH on basis of actual km (8 lakhs) earned or 8 year
whichever is earlier.