Involvement of laboratory in addressing
reliability issue has paid reach dividends especially in air brake and
there is an urgent need to replicate the experiment in other sections/areas.
ACMTs have to act as nodal Officer’s for quality control, failure investigation
and certification of testing & maintenance practices.
1. . Labs must identify and analyze
root cause of failures. Comments must cover:
·
Material issue- specific material
faults/ defects /& why they develop? What checking should be done at the time of fitment to
arrest subsequent material degradation & suggested in-situ checking
·
Fitment issue- what specific
acts/mistakes are leading to component failures? Factors like poor knowledge
and skill level should be identified & action plan suggested. Testing & cross-checking knowledge and
skill should be jointly done.
Sr.
DME. Dsls must review lab presentation personally to ensure meaningful analysis
and recommendation.
2. Vendor
wise performance record
to be kept for all mechanical components. Data base of failures ( line, Shed
and OVH failures before 2 yrs service life) to be kept.
3. Examination
of released components:
All released components after stripping during OVH should be minutely
examined. root cause wise analysis of
each component which exhibit deterioration/damage should be done. Specific
suggestions should be given to section so that service life can be at least
doubled from present level.
4. Lab exception list:
. Exception list should be updated
every fortnight. Action taken on items featuring in exception list should be
recorded with signature of the supervisor of the concerned section. Moreover,
abrupt changes in viscosity and spectro report must be highlighted in the
exception list.
ACMTs must weekly review testing practices.
5. Water
system leakages-
Vulnerable locations have been identified.
Equalizing pipe to be converted to 1 inch dia and to be replaced during M24
schedules to avoid choking. Water jumper brazing leakages, sign of seepage, hydraulic
testing to be ensured by Lab . ACMT in consultation with
other labs should issue list of root causes for water related failures. All Sheds
must attend each loco during major/medium schedule accordingly, so that water
leakages don’t happen during running schedule.
6. Lube
oil leakages-
Vulnerable locations have been identified. ACMT should issue
list of root causes for lube oil leakages. All Sheds must attend each loco
during major/medium schedule accordingly, so that lube oil leakages are not
encountered during running schedule.
7. List
of warranty claims
records should be maintained for all prematurely failed mechanical components.
8. Metallurgical
investigation:
Failed components are currently not being metallurgically examined. All major
cases of component failures are to be analysed in major labs as comparative
metallurgical testing facilities are not available in Shed.
9. Examination
of failed components by lab:
All cases of line/Shed failed component sample are not sent to lab by concerned
sections. Sr.DMEs must enforce discipline & make suitable maintenance
system.
10. Record
of corrective action:
Faults recorded by lab are advised to section but corrective actions taken
& results obtained are not recorded. Lab must record the same, message loop
must be completed.
11. Periodical
checking of all mechanical components of stores & section should
be done by ACMT & his team. Irregularities noticed should be reported to
Sr.DMEs & HQ.
12. Feedback
to RDSO/DLW/OEMs:
Product deficiency observed after analysis should be reported to firm & Inspecting Agency.
13. Focused
testing of failure prone components: List of items which have
failed prematurely should be compiled by lab. All such identified components
should be subjected to two stage test, one during material accountal stage
& another before fitment. This will ensure that material related problems
do not recur. All mechanical items must be pre
tested by lab before fitment irrespective of previous inspection.
14. Computerization of lab records: All
lab record keeping must be computerized in all Sheds. One PC for LMG lab should
be provided for record keeping.
15. Air
brake section: Air brake valve overhauling & lab involvement in testing
& auditing maintenance practices should be replicated in all Sheds in all
mechanical sections. This is the roadmap to be followed. It was again
confirmed by ACMT that no defect has been observed in old released rubber
kits after examination of stripped Air Brake valves taken for OVH.
16. NDT:.
Rejected materials should be reported to Firm for corrective
action. Reason of rejection of old material should be reviewed and proper
screening procedure to be devised to weed out defective material during testing
of new material itself.
In case of Cam Gear and Split Gear, severity of pitting
should be quantified. Rejection should be done during Shed detection preferably
M24/48 to avoid line failures.
For traceability of rejected
components, section should put ID mark by either itching or punching.
Each Shed should
devise new/additional testing methodology based on present rejection of old
materials during NDT. Components to be zyglo tested as per OEM should
not be subjected to DPT and prevailing practice to be stopped with immediate
effect. DPT to be done only after proper cleaning e.g. grinding and polishing
of welded surfaces etc.
Rejected material should not be returned to section,
proper record should be maintained and after keeping samples, rest materials
should be scrapped and deposited in stores to avoid recycling.
Main/ Con Rod Bearing to be tested as per MI only.
17. Lab
testing practices:
List of practices discontinued should be compiled and reintroduced. ACMTs must
confirm the same. Shed
has started :
·
Radiator
fan blades visual checking during minor schedules & dye penetration test
M-2 and on ward schedule.
·
Suspension
bearing oil checking in every schedule. Ultra sonic testing of suspension
bearing.
·
Crackle
test of Fuel Oil from cylinder head leak-off to detect nozzle sleeve crack.
·
Spectrographic
analysis of Compressor oil from M2 schedule onwards.
·
100 %
checking of gaskets.
Other Sheds must start or confirm
the same if already being done.
18.Analysis
by Lab:
Water pump failures are due to
- Loose
castle nut, free rotation of impeller, breaking of split pin
- fitment
of impeller without ensuring interference and dimensional accuracy
- Poor
Quality of split pin and handling of split pin.
Shed must submit action plan to
arrest above root causes.
Riser pipes initially fitted at RB are susceptible to
failures either due to material defect like lap or fitment fault. Shed should
identify the root cause and advise OEM accordingly. All RB locos to be attended
in next M4 schedule for water riser attention.
Issue of poor quality of
High pressure joint sheet was
reported. All such inferior gaskets not
conforming to specification and prone to failure must be rejected. However, it must be ensured that gaskets are
fitted only after proper surface preparation and blue matching. Surface
irregularity must not be covered by gaskets.
Gasket Specification should be collected and minimum
testing facilities should be developed at Lab.
Procurement of Rubber Component should be done in
split up lot only and as per six monthly requirements. Suitable
clause should be incorporated.
Hi buddy, your blog' s design is simple and clean and i like it. Your blog posts about Online writing Help are superb. Please keep them coming. Greets!
ReplyDeleteTPU Discharge Hose