Sub:
- Magnet valve maintenance.
Recently Loco No. 16167 failed on 8/7 due to reverser
magnet valve defective.
Sheds are advised to incorporate
following maintenance practices in magnet valve checking & OVH to ensure
reliability.
·
Measure operation
time of power contactor & reverser. Note operation timing variation amongst
different power contactors. Magnet valves linked to sluggish operation should
be replaced. Uniform lower application timing in all contactors is desirable.
Trend of application time should be monitored as predictive maintenance tool.
·
Look for sign of oil, moisture & dirt in magnet
valve & attend in every schedule.
·
Measure air inlet pressure of magnet valves. If air
pressure is less than 5kg/cm2, look for leakage in pipe lines and arrest the
same.
·
Use of Bhel type modified magnet valve &
checking condition of thread & adapter of pneumatic pipe.
·
Lapping of magnet valve during OVH. Lapping machine
should be procured/fabricated in every test room.
·
Identical operation time of valve and power
contactor in MEP locomotives to avoid logging of fault .
·
Ensure proper locking of fasteners and provide a
locking plate to avoid loosening on run. It must be ensured during
pre-commissioning of locomotives after POH/IOH/ rebuilding.
·
Clean nose compartment air filter every month &
replace filter in M4 and above schedules.
·
Test bench checking of magnet valves.
·
Training of minor schedule electrical staff on tell
tale sign of malfunctioning of power contactor on sluggish operation, variable
application timing, presence of oil in air and inadequate air pressure.
OVERHAULING PROCEDURE OF MAGNET VALVE
1. Magnet valve overhauling to be
done in M24 Sch and above.
2. After dismantling, clean all
spares with Orion/petrol and compressed air to upper & lower interior and
valve seat.
3. Check operating coil resistance
and conduct inter turn short circuit test.
4. Visually check inlet valve,
exhaust valve, spring etc for sign of damage corrosion and pitting.
5. If any groove is observed in
mating face, lapping of both the valves are to be done with lapping paste in
lapping machine.
6. During assembly, replace rubber
shim to tighten the op. coil.
7. Replace nylon washer under the
plug.
8. If spring is found short in
length or having less stiffness, it should be replaced.
9. Check armature stop at corner
point using magnifying glass for any crack.
10. Fit armatures stop mounting
screws with proper spring washer and seal it with a MS thin strip so that if
loosened, should not drop on run.
11. Test m/valve with 5 kg/sq. Cm.
air pressure. No air should leak from exhaust port or anywhere.
(Foam or soap with water can be used for the
purpose)
12. Operate coil with 72 v DC
supply and check. Air should come through outlet port only.
If leakage is observed, rework is required.
·
Also
care should be taken during fitment in loco, to ensure proper seating of rubber
O ring.